 Electricity is not just a basic utility—it is the foundation of modern life. Whether you're building a new home, opening a shop, or starting a farm, having access to power is a necessity. In Odisha, the government has made it easier than ever to apply for a new electricity connection, both online and offline.

This detailed blog post will guide you through every step, list required documents, explain costs, and give you official links to make your application process smooth and successful.


How to Apply for New Electricity Connection in Odisha: Full Guide (2025) - PSP Studio Odia
How to Apply for New Electricity Connection in Odisha: Full Guide (2025) - PSP Studio Odia


⚡ Electricity Distribution in Odisha

Odisha's power distribution is managed by four major electricity companies under TPCODL (Tata Power Central Odisha Distribution Limited) and other zones:

RegionCompany Name
Central OdishaTPCODL (Bhubaneswar, Cuttack etc.)
North OdishaTPNODL (Balasore, Baripada etc.)
South OdishaTPSODL (Berhampur, Rayagada etc.)
Western OdishaTPWODL (Sambalpur, Rourkela etc.)


These are all operated by Tata Power, ensuring a standardized and digital application process.



🧾 Types of Electricity Connections

You need to choose the correct type of connection before applying:

  • Domestic Connection: For homes and apartments

  • Commercial Connection: For shops, offices, hotels

  • Industrial Connection: For factories, production units

  • Agricultural Connection: For tube wells, irrigation pumps

  • Temporary Connection: For construction or short-term events



📄 Required Documents

Here is a complete list of documents you will need:

  1. Identity Proof (Any one):
    Aadhaar Card / Voter ID / PAN Card / Passport / Driving License

  2. Address Proof:
    Aadhaar Card / Land Deed / Rent Agreement / Utility Bill

  3. Ownership Proof:
    Patta / Khata / Land Registration Deed / NOC (if tenant)

  4. Photograph:
    Passport-size photo of the applicant

  5. Load Requirement Details:
    In kW or kVA (for industrial/commercial)

  6. Electrical Wiring Completion Certificate (optional in some areas)



🌐 How to Apply Online for New Connection in Odisha

The online application process is simple and convenient. Follow these steps depending on your region:


How to Apply for New Electricity Connection in Odisha: Full Guide (2025) - PSP Studio Odia
How to Apply for New Electricity Connection in Odisha: Full Guide (2025) - PSP Studio Odia



✅ For TPCODL (Central Odisha)

Official Website: https://www.tpcentralodisha.com/

Step-by-Step:

  1. Go to: https://www.tpcentralodisha.com/

  2. Click on "New Connection" under Services

  3. Register with your mobile and email

  4. Choose your Connection Type (Domestic/Commercial/Industrial)

  5. Fill in all required details

  6. Upload the scanned documents (JPEG/PDF)

  7. Submit the application

  8. Receive an Application Number for tracking

  9. Pay Application Charges (Online Payment Available)

  10. Schedule site inspection



✅ For TPNODL (North Odisha)

Website: https://www.tpnodl.com

Follow same steps as above. Portal is designed similarly.



✅ For TPSODL & TPWODL

TPSODL: https://www.tpsodl.com
TPWODL: https://www.tpwesternodisha.com

Just visit their site → Click on “Apply for New Connection” → Proceed with digital form.



🏢 How to Apply Offline

If you’re not comfortable online, you can apply offline:

  1. Visit your local Electric Subdivision Office

  2. Collect the New Connection Application Form

  3. Fill it carefully

  4. Attach all required documents

  5. Submit at the counter

  6. Get a receipt with Application Number

  7. Site inspection will be arranged

  8. Pay the required fees in cash/bank

Tip: Keep one copy of your form and receipts for future tracking.


How to Apply for New Electricity Connection in Odisha: Full Guide (2025) - PSP Studio Odia
How to Apply for New Electricity Connection in Odisha: Full Guide (2025) - PSP Studio Odia



💸 Application Fees and Security Deposit

The fee depends on your load and type of connection:

Type of ConnectionApplication FeeSecurity Deposit
Domestic (Up to 2kW)₹100–200₹500–2000
Commercial (Up to 5kW)₹500–1000₹2000–5000
Industrial / Heavy Load₹1000+As per load


Additional fees may include:

  • Line extension charges (if far from main pole)

  • Meter cost

  • Labour & materials



🔍 Site Inspection & Approval

Once your application is submitted:

  1. A technician/engineer from the electricity board will visit your premises

  2. They will check wiring, pole distance, meter board, and overall safety

  3. Based on the inspection, they will approve or suggest changes

If everything is okay, you will get an approval email/SMS within 7–10 working days.



📦 Meter Installation & Connection Release

Once approved and fees paid:

  1. An electrician will come to install the meter and cables

  2. Power supply will be connected from the nearest pole

  3. Meter reading and Consumer Number will be recorded

  4. You can now start using electricity legally

You will also receive:

  • Connection certificate

  • Consumer ID / Account No.

  • Instructions on how to register for online billing



📲 Post-Connection Tips

  1. Register for e-Billing:
    Download the Tata Power app or register on the website.

  2. Pay Bills Online:
    Avoid late fines, pay using PhonePe, Paytm, Google Pay, etc.

  3. Monitor Usage:
    Use the online portal to check your usage in units and cost.

  4. Raise Complaints Online:
    For outages or faults, use the official app or call 1912.



❓ Frequently Asked Questions

Q. How long does it take to get a new connection?
A. Usually 7–30 days depending on site inspection and paperwork.

Q. Can I apply without owning the land?
A. Yes, but you need a No-Objection Certificate from the landowner.

Q. What is the load limit for domestic connections?
A. Usually up to 5kW. For more, apply as commercial or request load upgrade.

Q. Can I transfer my connection if I move?
A. Yes, use the “Change of Name” option on the portal.



🔗 Useful Links

ServiceLink
TPCODLhttps://www.tpcentralodisha.com/
TPNODLhttps://www.tpnodl.com
TPSODLhttps://tpsouthernodisha.com/
TPWODLhttps://www.tpwesternodisha.com
Odisha Electricity Complaintshttps://www.odisha.gov.in
Consumer Helpline (1912)Call 1912 or local zone office


👨‍💼 Author Profile

Author: PARTHASARATHI PANDA (M.Com)


A dedicated blogger, website designer, YouTube content creator, and social media influencer from India. With a Master’s degree in Commerce (M.Com), PARTHASARATHI PANDA creates and shares knowledge to help people grow digitally and personally.


Writes and speaks in English, Hindi, and Odia to support audiences across languages and regions. His mission is to empower everyone — from students to farmers — with free and useful content online.


✨ Connect with Me:







📢 Conclusion

Getting a new electric connection in Odisha has become faster, easier, and digital thanks to Tata Power’s reliable services across the state. Whether you choose to apply online or offline, following the steps above will ensure your application is approved smoothly.

Stay connected with me at HELP ODIA & PSP STUDIO ODIA for more useful guides!




0 comments:

Post a Comment